Retrofitting


Retrofitting Projects successfully Completed:
1 Pilecap, short Column, Column, Floor Beam, Lift up to 5th floor as per  ACCORD apporved  Drawing MZM(CEPZ) LIMITED., plot no-8~9,sector-2/A, CEPZ, Chittagong. Bangladesh 5M 12 days  (18th August 2016 to 30th December, 2016 2017 2017
2 Pilecap, short Column, Column, Floor Beam, Lift up to 5th floor as per  alliance apporved  Drawing WHITEX GARMENTS (PVT. LIMITED., plot no-86~90,sector-3, KEPZ, Chittagong. Malaysia Started from February,    2017 2017
3 Foundation, Column, Beam, Pre-fabricated Roof sheet & others Kenpark Bangladesh Apparel (PVT) Ltd., unit-5, Plot#14~23, Sector#2,KEPZ, CTG Sri-Lanka   2,017.00 2017
4 Column, Beam, Pre-fabricated Roof sheet & others Kenpark Bangladesh Apparel (PVT) Ltd., unit-3,  Plot#14~23, Sector#2,KEPZ, CTG Sri-Lanka 2017
5 Foundation, Column, Beam & others Evertoby (BD) Ltd.,Plot#86, Sector#7, CEPZ, CTG  Korea 2017
6 Building#A,B,C,D & E Premier 1888 Ltd, plot# 41 TO 47 &84, SECTOR-7, CEPZ, CTG Pakistan 2017
7 Foundation, Column, Beam & others Ofma Camp Ltd, plot#58~62, Sector#3.KEPZ CTG.  Korea 2017
8 Foundation, Column, Beam & others Mitali textiles Ind. Ltd., plot#4 ~6, Sector#5/A, CEPZ, CTG. Pakistan 2017